Based on joint bidding by SUNLION & CNPC, we win the bend part of OBIAFU/OBRIKOM-OBEN NODE (OB3) GAS PIPELINE PROJECT in April. Now the bend pipes are under smoothly producing , SUNLION and NNPC's representative will proceed the Inspection process between May.26th-June.15th.
The X70-PSL2 bend with coating is still a top-technical point in this field.
Project Introduction:
The Nigerian National Petroleum Corporation (NNPC), through its Gas Infrastructure Division (GID) intends to construct a 48” x 127km, Class 600 trunk gas supply pipeline from Obiafu/Obrikom (OB/OB) in Rivers State through the NGC Oben metering station in Edo State and to terminate at Oben Node at Ijomiin Oghara in Delta State and Gas Treatment and Pressure Reduction Facilities with capacity of 2Bscf/d.
SUNLION&CNPC team and NNPC's representative:
Bare bend pipe:
Package of bend pipe with coating